INSTALLATION & OPERATION MANUAL DO NOT DISCARD THIS MANUAL! POWERMAXtm GAS INFRA-RED WATER BOOSTER HEATERS Model PM200 and PM400 IMPORTANT FOR
8 Follow instructions on the tag located on the Temperature and Pressure Relief valve to avoid contact with hot water discharge and to prevent wat
9 ELECTRICAL The electrical power supply requirement for the booster heater is 120 volts, AC, 60Hz, 6.0 amps or less. Field wiring connections a
10
11
12 OPERATING SEQUENCE The booster heater is designed to produce 180-190 degree sanitizing rinse water for commercial dishwashing machines. Sp
13 POWERMAXtm START-UP PROCEDURE For your safety, read completely before operating. CAUTION: DO NOT turn Power Switch ‘on’ until the booster
14 FOR YOUR SAFETY, READ BEFORE OPERATING WARNING! - IF YOU DON’T FOLLOW THESE INSTRUCTIONS EXACTLY, A FIRE OR EXPLOSION MAY RESULT CAUSING PROPE
15 TO TURN OFF GAS TO APPLIANCE 1. Turn off all electric power to the booster heater if service is to be performed. 2. Turn off manual gas val
16 MAINTENANCE Lubrication The water pump motor and the combustion air blower are permanently lubricated and require no periodic maintenance. Au
17 TROUBLE SHOOTING CAUTION: Label all wires prior to disconnection when servicing controls. Wiring errors can cause improper and dangerous oper
ii TABLE OF CONTENTS Page General Information 1 Installation Codes 2 Unpacking 2 Locating 2 Combustion Air/Ventilation 3 Exhaust Venting 3
18 REPLACEMENT PARTS LIST When ordering parts, always refer to the Model number and Serial Number. The data plate is mounted on the electrical p
19 LIMITED WARRANTY: Products manufactured by Vanguard Technology. Inc. are warranted to be free from defects in material and workmanship, when
20 APPENDIX A TYPICAL SPECIAL STAINLESS STEEL VENTING For use with Category II, III, IV appliances Contact Local Building or Fire Officials Abo
21 Appendix A JOINT PROCEDURE (see illustration #1 below) 1. The outside of male end and inside of female end of pipe must be cleaned before app
22 Appendix A SIDE WALL VENTING INSTALLATION SIDE WALL VENTING INSTALLATION (see illustration #2) 1. Install wall thimble into wall, observing t
23 Appendix A 3. The system must be supported along its horizontal length at all elbow locations and joints (every forty-eight inches or less) u
24 29495 Airport Road, Eugene, OR 97402Tel:(541) 461-6020 Fax:(541) 461-6023Toll Free: 1-800-624-4809 Factory Authorized PowerMax Start-U
25 Page 2 Vanguard Technology Inc. Factory Authorized Start-Up - Verification Worksheet - continued ! Bleed air from accumulator and hea
1 GENERAL INFORMATION The POWERMAXtm gas fired, infra-red water booster heater provides 180 degree sanitizing rinse water for commercial dis
2 INSTALLATION CODES Installation must be performed in accordance with state and local codes, or, in the absence of local codes, with the follow
3 COMBUSTION AIR / VENTILATION The POWERMAXtm must be provided with an adequate supply of air for proper combustion and ventilation as required b
4 2. Through the ceiling/roof (see fig.3) or through a sidewall (see fig. 4). Type B-1 vent pipe (inch min. diameter) may be used when venting v
5 any door, opening window or gravity air inlet into any building. It shall also have a minimum horizontal clearance of four feet from any electr
6 The gas valve is provided with a pressure tap to measure gas pressure downstream, which is also the manifold pressure (fig. 5.). The gas piping
7 Recommended water hardness is 4-6 grains of hardness per gallon. Chlorides must NOT exceed 50 parts per million. Water hardness above 6 grains
Kommentare zu diesen Handbüchern